Aloha Kakou:
With the service lanai side of D building masked, the painters have turned their attention to the makai lanai side. Masking continues and painting has begun on the eave between D204 and D205. The backplates of the outdoor walkway sconces are being installed prior to the painting and the shades are installed after the painting is complete.
Tuesday, September 15, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment